展开

工程造价论文范文-FAHP评价的绿色建筑增量成本管理研究(3)

发布时间:2013-11-29   |  所属分类:审计:论文发表  |  浏览:  |  加入收藏

  [3] 李云舟,何少剑,朱惠英,陶尚儒,绿色建筑住宅小区的建造成本增量控制分析[J].建筑科学,2009 25(4) :76—81.

  [4] Ma Hui,Wang Jianting,Study on the economic externality of green building [J].Industrial Engineering and Engineering Management,2010 23(412) :2475­—2478.

  [5] 孙大明,邵文晞,绿色建筑技术增量成本分析[J].建筑科学,2010 26(6) :91—94,100.

  [6] Zhang Xiaodan,Xiao Yuejun,Research on the LCC Model of Energy-Saving Residential Building[J].Information Management, Innovation Management and Industrial Engineering,2009 31(12) :144 —148.

  [7]中国建筑科学研究院.GB/T 50378—2006,绿色建筑评价标准[S].北京:中国建筑工业出版社,2006.

  [8] Alonso M. Martinez J -M Santonja V ,Lopez P, Duato J,Power Saving in Regular Interconnection Networks Built with High-Degree Switches[J].rallel and Distributed Processing Symposiuml,2005 18(14) :1535-1545.

  [9] Yi Sun,Yu Wen li, Power Saving in Regular Interconnection Networks Built with High-Degree Switches[J].Mechanic Automation and Control Engineering,2010 6:26—28.

  [10] Jafer E O\'Flynn B O\'Mathuna C,Spinar R,A Study of the RF Characteristics for Wireless Sensor Deployment in Building Environment[J].Sensor Technologies and Applications, 2009 21(8) :206—211.

  [11] Sodja Anton,Zupancic Borut Duato,Some aspects of thermal and radiation flows modelling in buildings using Modelica [J].Computer Modeling and Simulation,2008 15(4):637—642.

  [12]Chan K.K.P,Lau R.W.H,Distributed sound rendering for interactive virtual environments[J].Multimedia and Expo,2005 22(2) :1823 - 1826.

  [13] Wirth T Thiele L,Haustein T.,Braz O., Stefanik, J,LTE Amplify and Forward Relaying for Indoor Coverage Extension[J].Vehicular Technology Conference Fall,2010 4 :1—5.

  [14] Lucuik M.,Seguin P.,Reid A.,Material and Operational Environmental Impacts of Building Insulation: How Much is Enough?[J].EIC Climate Change Technology,2007 15(1) :1-13.

  [15] James F Peters,Intelligent System Design and Architectural Patterns [J].2003 2 :808—811.

  [16] 张吉军,模糊层次分析法(FAHP)[J].模糊系统与数学,2000 14(2) :80—88.

  [17] 周曼,沈涛,周荣坤,模糊层次分析法在综合电子信息系统标准适用性分析中的应[J].电子学报,2010 38(3) :654—657.

  [18] Sharaf Adel M,El-Gammal Adel A,A Smart Dynamic Electric Energy Conservation VSC-Self Regulating Controller for Micro Hydro-Fuel Cell Green Scheme [J].Mathematical/Analytical Modelling and Computer Simulation,2010 21(6) :424—430.

  [19] Yang Shih-ming, Fuzzy finish time modeling for project.scheduling[J].Journal of Zhejiang University-Science A(Applied Physics & Engineering), 浙江大学学报A辑(应用物理与工程)(英文版) 2010 11(12) :946—952.

  [20] 陈娟,基于多层次模糊综合评判模型的跨国工程项目风险评估[J].统计与决策.2008 (5) :946—952.

转载请注明来自:http://www.uuqikan.com/shenjilw/1238.html


上一篇:工程预算评职论文发表简述建筑工程土建预算及应用策略
下一篇:建筑工程职称论文发表成本控制浅析